Ben Ahmed – Khouribga Highway

 

Consistance of the contract:

Construction Works of Berrechid – Beni Mellal HighwaysBen Ahmed – Khouribga Section.

Total Amount: 117 201 427,86 euro

Period of the contract : 36 Months

Length: 38,736 Km

Work Package B: Liberating sites- Earthworks- Sewage Treatments:

Earthworks: fill and cut: 9 867 350 m3

Work Package C: Pavement:

  • Sub-base: 502 000 m3
  • Substructure in GNT 0/20: 357 500 m3
  • Asphalt BB: 150 500 t
  • High Modulus asphalt : 231 500 t
  • Surface coating : 247 000 m2
 

Work Package D: Major civil engineering structure:

  • Concrete: 57 050 m3
  • HEL steel: 6 023 850 Kg
  • Formwork: 95 550 
  • Piles of 1200: 200 ml
  • Security barriers (DBA) : 42 460 ml
  • 11 Overpasses
  • 5 underpasses
  • 11 pedestrian crossings.
  • 6 Roadways for vehicles
  • 20 scuppers of varying dimensions.