Urban Developments at Fes

Sewage Treatments:

  • Collectors of varying diameter sizes: 15Km 

Roadways:

  • Sub-base and substructure: 52 000 m3 of GNT 0/31,5
  • Road Surface layer in BB : 37 000 t

Sidewalks :

  • Construction of sidewalks: 122 000 m2
  • Coating of sidewalks: 122 000 m2