Sewage treatment works:

  • Collectors of varying diameter sizes : 12 km

Roadways works :

  • Sub-base and substructure: 67000m3 of GNT 0/31,5
  • Road surface layer in BB: 42 000t

      

Sidewalks:

  • Construction of sidewalks: 232 000m2
  • Coating: 232 000 m2