Awarding Authority: Roads Departement

Consistance of the contract:

  • Works of construction of the Mediterranean bypass road
  • Oued Laou- El Jebha Section

 

Length: 76 km

Total Amount: 148.803.997,33 Euro

Contract Period: 46 Month

Earthwork 

  • Cut and fill : 5.131.982,46 m3

 

Pavement:

  • GNF- GNT: 287 125 m3
  • Double-layer surfacing: 486 000m2

Hydraulic Structures:

  • Concrete ( Major civil engineering structure –O.H- Support): 43 506 m3
  • 67 scuppers
  • 7 Retaining walls in reinforced earth
  • 4 walls in Reinforced fill
  • 5 retaining walls
  • 62 Nozzle Structures

Major civil engineering structure:

  • Bridge over Oued Amter: Length 280ml, Number of spans: 7*40 m,  Foundations 1236 ml piles 1200.
  • Curved Ribbed bridge over Oued taghassa: Length:165 ml, Number of spans: 6*25 ml
  • Curved Ribbed bridge at KP 45: Length:96 ml, Number of spans: 3 
  • Curved Ribbed bridge over Oued Jnane: Length:92 ml, Number of spans: 3