Awarding authority: Highways of Morocco

Consistance of the contract: Construction Works of   Berrechid – Beni Mellal Highways: Khouribga – Oued Zem Section.

Length: 32,751 Km

Total Amount: 1 067 023 738.07 MAD

Period of the contract : 35 Months

Work Package B: liberating sites- Earthworks- Sewage Treatments:

  • Earthworks: fill and cut: 6 877 800 m3
  • Hydraulic Structure:

  • Nozzle Structure in reinforced concrete: 10 600 ml
  • All types of drains: 70 210 ml
  • Drainage, water rafting and draught excluders
  • Telecommunications pipe chase: 37 580 ml

 

Work Package C: Pavement:

  • Sub-base: 450 000 m3
  • Substructure in GNT 0/20: 294 000  m3
  • Asphalt GBB+BB: 134 000 t
  • High Modulus asphalt : 175 000 t
  • Surface coating : 225 000 m2

 

Work Package D: Major civil engineering structure:

  • Concrete: 41 260 m3
  • HEL steel: 3 205 000 Kg
  • Formwork: 58 750
  • Piles of 1200: 200 ml
  • Security barriers (DBA) : 35 150 ml
  • 18 Overpasses
  • 3 underpasses
  • 5 pedestrian crossings.
  • 3 Roadways for vehicles
  • 9 scuppers of varying dimensions.