Mediterranean Bypass Road: Ajdir – Ras Afrou Section

Awarding authority: The Development Department of Nador,

Consistance of the contract:

  • Works  of construction of the Mediterranean Bypass road
  • Ajdir – Ras Afrou Section

Enterprise: ASTALDI SPA –ISTALSTRADE SPA

Length: 84KM

Total Amount: 41 455 183,58 euro

Period of the contract : 40 Months

Work Package B: Liberating sites- Earthworks- Sewage Treatments:

  • Earthworks: fill and cut: 10 294 000 m3
  • Drainage, Sewage treatment:

  • Paving slab in reinforced concrete: 33 600 m3
  • Concrete Pile Ø 1000/800/600 in CAO : 5 350 ml
  • All types of drains: 4 590 ml

Work Package C: Pavement:

  • Sub-base: GNF2 / GNF1 : 340 000 m3
  • Substructure in GNA / GNB : 207 000 m3
  • Bi-layer Coating : 780 000 m2

Work Package D: Major civil engineering structure:

  • Major civil engineering structure n°7 in reunforced concrete over Oued TAZAGHINE ; length: 58 ml
  • Major civil engineering structure n°8 in prestressed concrete over Oued SIDI SALAH ; length: 80 ml
  • Major civil engineering structure n°9 in prestressed concrete over Oued AMEKRANE ; length : 240 ml
  • Major civil engineering structure n°10 in prestressed concrete over Oued TIGHZA ; length : 80 ml
  • Major civil engineering structure n°11 in prestressed concrete over Oued TIZIRINE ; length :80 ml