BADIS Subdivision and building sites development at AL HOCEIMA

Earthworks:

Works on 82 hectars of mountainous sites:

  • fill and cut: 825 000m3
  • Protection devices
  • 3 linking projects with the city of El Hoceima

 

Sewage treatments

Collectors of varying diameter size: 12km

Urban facilities

  • Sub-base and substructure: 127 000m3 of GNT 0/31,5
  • Road surface layer in BB: 58 000t
 

Sidewalks:

  • Construction of sidewalks: 432 000m2
  • Coating: 432 000 m2