Awarding authority: Independent Agency of Road Works of Senegal

Consistance of the contract: Periodic Maintenance Works of 116 km of paved roads in KAOLACK and Fatick Régions

Enterprise : Consortium HOUAR – SEPROB – SNCE

Length: 86 KM

Total Amount: 13 963 942,30 Euros

Period of the contract : 18 Months

Earthworks:

  • 22 600 m3

 

Pavement:

  • Sub-base in untreated laterites: 125 000 m3
  • Substructure and treated shoulders with 3% cement: 110 000 m3
  • Pavement (width 7,2 ml) in bitumen concrete 0/14 (thickness  5 cm) : 734 000 m3
  • Singlelayer surfacing Chipseal for shoulders (2 x 1,5 ml) : 365 000 m2

 

Hydraulic Structure:

  •  22 Nozzle Structure 1000
  • 15 Scuppers in reinforced concrete