Awarding authority: Road Department

Consistance of the contract:

  • Works  of construction of the Mediterranean Bypass Road
  • Tetouan – Oued Laou Section over 46Km.

Total Amount :  70 861 773,34 euro

Period of the contract: 32 Months

Earthworks:

  • Fill and cut: 5 498 667 m3

Pavement:

  • GNF-GNT: 206 248 m3
  • Double layer Coating: 306 800 m2

Major civil engineering structure:

  • Bridge over Oued Azla: Length: 75 ml, Numbers of spans:3*25m 441ml ,1200piles
  • Bridge over Oued Amsa: Length: 100 ml, Numbers of spans:4*25m 585ml ,1200piles
  • Bridge over Oued Tamrabt: Length: 60 ml, Numbers of spans:4*25m 85ml ,1200piles

Hydraulic Structure:

  • Concrete (Major civil engineering structure – O.H- Support): 43 506 m3
  • 108 scuppers
  • 9 Retaining walls in reinforced earth
  • 3 walls in Reinforced fill
  • 99 retaining walls